A really short day today- unless I decide to get re-motivated in the heat of the afternoon.
I wanted to complete the door assemblies today. Which basically comes down to fitting two peg board panels and sizing the rails and stiles on the 2nd door.
Here is the first panel sized to fit. Note the handy pocket screw joinery.
The is the first door completed. It looks pretty good doesn’t it?
And finally here are both doors propped up in front of the cabinet.
The only thing I wish I could do different at this point is have shorter pocket screws. I had some 1″ screws which are not long enough and I had 2 1/2″ screws which either began to poke through or actually did come through the face of the stiles. I am going to see if anyone in town has shorter pocket screws in stock (Woodcraft maybe?).
All that is left if the hinge hardware and the door handles. Then it is time to be hung.